Solves thermal construction, insulated roofs, replacement of the openings of pavilion B1 parcele 2255/1, no. 805. The building is affected by the comments of the conservationists, the monument document see attachments, according to PrŽaP it is necessary to meet 10 % energy savings, the achieved energy savings of 38.1 % are requested to grant 50 % + EPC 5 %. The applicant assumes the use of the EPC method in the building, cost-saving examinations solved in the previous call (for the project under registration number CZ.05.5.18/0.0/0.0/17_070/0006789. We are asking for support from NZU.