The project is aimed at building a photovoltaic power plant, which will be installed on the roof of the existing building on Olomoucská street in Jevíček. It will also include the installation of a battery storage for the accumulation of electricity. The electricity produced by the photovoltaic power plant will serve to cover the company’s own consumption, the unused electricity at the time of the maximum power of the power plant will be accumulated in the battery storage and the remaining part of the electricity will be supplied to the transmission system.