Objective of the project: The primary objective of the project is the conversion of 440 series units (so-called dualisation), which prepares the selected units for the planned switching of the traction system to 25 kV/50 Hz. Subject of the project: Conversion of 5 pcs of 440 series units to ensure their compliance with selected LOC &PAS TSIs and ENE TSIs. Project costs: The cost of rebuilding the vehicles is assumed to be CZK 100 million excl. VAT, while 50 % is expected to be covered by the subsidy.