Solves insulation circuit. structures, insulated roofs, replacement of filling holes of pav. B4 to the parc. 2252, np. 808. The building is affected by the comments of conservationists, the monument document see attachments, according to PrŽaP it is necessary to meet 10 % energy savings, the achieved energy savings of 43.36 % are requested to grant 50 % + EPC 5 %. The applicant assumes the use of the EPC method in the building, cost-saving examinations solved in the previous call 70 (for the project under registration number CZ.05.5.18/0.0/0.0/17_070/0006789). We are asking for support from NZU.