The extension of berth quay No 12 and the consolidation of the land behind it will expand the activity of the berth and will enhance the area of port territory that cannot be used at present due to the lack of possibility to operate vessels. In addition, by arranging the pier during the extension of the berth, dredgings will be carried out in front of it, which will facilitate the access and manoeuvres of ships to berths. The closure of berth no. 10 will lead to the acquisition of port territory behind it, giving the possibility to develop the activity at this berth. Making fillings behind the key will also lead to its strengthening, increasing its stability. On the closing side, perpendicular to the existing pier and the pier, it will also be possible to create a mooring front.