According to the specifications of the Operational Programme Large Infrastructure 2014-202, Priority Axis 9 Protecting population health in the context of the COVID-19 pandemic, Specific Objective 9.1 Increasing the capacity to manage the COVID-19 health crisis, the overall objective of the project is to improve the care and treatment capacity of cases of SARS-CoV-2/infection management of the health crisis, by strengthening the medical infrastructure at the level of the Moreni Municipal Hospital, with a focus on the infrastructure of medical fluids. The way in which the project contributes to the result indicator of the program (2S132 The appropriate capacity for care and treatment of cases of SARS-CoV-2/infection management of the health crisis), and generates a positive long-term effect, consists of carrying out intervention works on the electrical infrastructure, as well as on the infrastructure of medical fluids, as well as in facilitating the provision of the sanitary unit with detection, signalling, fire alarm systems, with a positive impact on the development of an adequate capacity to manage the health crisis. This will make the healthcare unit better prepared to act promptly and with appropriate means, thus contributing to the timely and effective response of the public health system to the COVID-19 crisis, but also in the event of future public health threats. The project contributes to the achievement of the result indicator of POIM 2S132, in strict compliance with the provisions of the GS, namely “Adequate capacity for care and treatment of cases of infection with SARS virus — CoV-2/sanitary crisis management — Prior to LIOP intervention: No, after the intervention: YES, YES. The activities proposed by the project, in conjunction with the allocated resources and the project budget, allow the achievement of the general objective and contribute to the achievement of the result indicator of the program.