Rehabilitation and modernisation of marginalised areas ZUM 1 — Carpathians and ZUM 2 — Fountain to increase quality of life and reduce the number of people at risk of poverty and social exclusion. The project aims to reduce the number of people at risk of poverty and social exclusion through integrated actions aimed at interventions in the social infrastructure (construction of the Integrated Community Centre where an emergency home for victims of domestic violence will be arranged, a space equipped with showers and washing machines to which children from the two marginalised areas have access), education infrastructure (modernisation of sports grounds from two educational units in the Caracal Municipality, to which children from marginalised areas have access, planning a kindergarten with 2 classes in CCI), infrastructure on the urban areas degraded, the infrastructure on the infrastructure of the two urban areas located in the area of the urban area (the urban infrastructure of the city and the modernisation of the 2-class kindergarten in the CCI), the infrastructure on the infrastructure of the two urban areas located in the area of the urban area (the urban infrastructure of the urban areas located in the area of the urban area, the urban infrastructure of the two districts, the modernisation of the 2-class kindergarten in the city), the infrastructure on the urban areas, the infrastructure of the urban areas located in the city of Romania (the urban infrastructure of the two districts), the infrastructure of the urban areas located in the urban area, the urban infrastructure of the urban areas located in the area of the area (the urban infrastructure of the urban areas of Romania), the infrastructure of the urban areas located in the city of Romania, the infrastructure of the two urban areas, the urban infrastructure of the urban areas, the urban infrastructure of the urban areas, the urban infrastructure of the two urban areas, the building of two urban areas, the infrastructure of the urban area, the urban infrastructure of the urban areas, the urban infrastructure in the area, the urban infrastructure of the urban areas located in the area of the area of the urban area, the urban infrastructure of the city, the urban infrastructure of the urban area, the urban infrastructure of the urban area, the area of the city of Romania, the area of the urban area, the infrastructure of the urban areas that are at risk of poverty and social exclusion, through integrated actions aimed at interventions in the social infrastructure (building of the Integrated Community Centre in which will be arranged an emergency house for victims of violence in the family, a space equipped with showers and washing machines to which children from the two marginalised areas have access), the education infrastructure (modernisation of two urban areas in the urban area), the infrastructure of the urban areas located in the area of the urban areas located in the area (the urban infrastructure of the city is located in the area of the area of the urban area, the urban infrastructure on the road, the infrastructure of the urban areas located in the city, the urban infrastructure on the road, the urban infrastructure on the road, the infrastructure of the two urban areas, the infrastructure of the urban areas that are located in the area of the city, the urban infrastructure in the area of the area, the urban infrastructure in the area of the area, the urban infrastructure of the city, the The present investment objective will be realised in the two Marginalised Urban Areas identified according to SDL Gal Heart of Romania and included in the Atlas of Marginalised Areas following the World Bank census: — Zum 1 Carpathians — ghetto type area with blocks/ghetto-type areas in former worker colonies — Carpathian Street 73 and 73 A — ZUM 2 Phanarie — slum-type areas with houses/slums with improvised housing/social housing areas or buildings abusively occupied in historical areas: str. Black Voda, No. 15; The Way of the Living;str. The vineyards; The Carpathian Alley, Str. Despatch, Str. Ion Neculce, Fundatura Ion Neculce, Str. Tepeş Voda, Str. The people, Str. Bistriţei, Str. Twinning, Str. Petre Puican, Str. Walter Mărăcineanu, str. The Contemporary, str. Romaniţei, str. Buzesti and Str. Vasile Alecsandri. The project, through the general objective, in conjunction with the specific objectives and expected results, is in line with the specific objective of the Investment Priority 9.1- Community-led local development within Priority Axis 9 — Supporting the economic and social regeneration of disadvantaged urban communities, within the Regional Operational Programme 2014-2020.