Overall objective of the project: “Increasing the safety of patients in public hospital structures using medical fluids, Priority Axis (AP)9 — Protecting the health of the population in the context of the COVID 19 pandemic — Rehabilitation and modernisation of electrical installations and ventilation, treatment and air purification facilities for the Municipal Hospital” is closely in line with the Large Infrastructure Operational Programme (IOP), Priority Axis 9 — Protecting population health in the context of the COVID-19 pandemic, Specific Objective 9.1 — Increasing the capacity to manage the COVID-19 health crisis and involves carrying out type A activities: acquisition and installation of the detection, fire signalling and oxygen detection plant including the realisation of related installations, type B activities consisting of assessing the deficiencies of the existing infrastructure, acquisitions of installation and intervention works on the electrical infrastructure, ventilation and air treatment, as well as the infrastructure of medical fluids, necessary for the treatment of patients with COVID-19 infection and for the management of the emergency situation caused by the COVID-19 crisis at the level of the Public Health Unit Ramnicu Sarat Municipality. The purpose and objectives of the project are fully consistent with the actions of the specific objectives of the project and with the eligible activities of the project, projected in the Grant Application. The project contributes to the achievement of the objectives, result and achievement indicators of the Priority Axis of LIOP. The way in which the project contributes to the LIOP result indicator is a qualitative one, namely the adequate capacity for care and treatment of cases of SARS-CoV-2/infection to manage the health crisis, after the intervention, by: construction of fire detection and signalling installations, oxygen detection, electrical installations, heating, air ventilation, air conditioning, voice systems, data, acquisition and installation of a fire detection and signalling plant, an oxygen detection plant, a lightning rod with amordation element and earth outlet, of an electrogen group, of a trafo post, of 18 outdoor units, of 18 CTA units The project objectives are clear, achievable, respond to identified deficiencies, are achievable during the project implementation period and are measurable. In view of the fact that limiting the spread of the virus, as well as its extremely serious effects on the Romanian population, implies the provision of medical equipment for hospitals, in the context of strengthening the medical infrastructure to cope with the high challenges of combating the COVID-19 outbreak, the state of physical and moral wear and the overload caused by the large number of patients of the medical gas networks and electricity networks create a major risk of