The overall objective of the project is the modernisation of RED and the increase of the distribution capacity of the 110/20kV Caracal West transformer station for the evacuation of electricity produced by CEFs (photovoltaic power plants). Modernisation and development of electricity distribution networks must become one of the main objectives of energy specialists, especially since this is also closely related to the need to improve the values of performance indicators of the distribution service. These medium-voltage electrical installations have as their main function the distribution of electricity to consumers in the area and the discharge of electricity from CEFs connected to these lines. The realisation of the modernisation project will lead to the achievement of the mandatory indicator at the level of project 2S54 and modernisation of the 110/20 kV transformer station Caracal West. Also, the modernisation of overhead LEA lines of medium voltage 20 kV (Caracal West — Redea 1 and Caracal Vest — Redea 2) will lead to the fulfilment of the additional indicator, the modernisation of 4.1 Km LEA 20 kV (Redea 2) and 4.24 km LES 20 kV (Redea 1). At the same time, the modernisation project contributes directly to the result indicator of POIM 2S53 — Gross production of primary energy from less exploited renewable sources, i.e. the modernisation is estimated to increase the gross primary energy production from renewable sources by 17.4 GWh/year, from 14.79 GWh/year to the non-project variant to 32.19 GWh/year, respectively an increase from 1,271 thousand toe/year in 2018 to 2,767 thousand toe/year in 2023. Project contribution in absolute values 2,767-1,271 thousand toe/year = 1,496 thousand toe/year. Considering that the reference value of the less exploited primary energy production from renewable sources is 455.96 thousand toe/year, the project contribution in relative values (1.496/455.96 * 100) is 0.328 %. The achievement of this general objective can be achieved only by setting specific measurable, realistic and achievable objectives that will be pursued throughout the project implementation period.