Actions aimed at conditioning the area of operations for use as a container terminal, in conditions of safety and compliance with current regulations._x000D_ Replacement, in the area of operations, of asphalt pavement by another HP-40 concrete pavement, in order to adapt it to the new regulations and uses. Without this new pavement it cannot be used as a container terminal complying with the regulations and allowing the stacking of authorised heights._x000D_ Installation of a new drinking water supply network to ships._x000D_ Optimisation of dock docks by installing additional bollards._x000D_ Enhancement of operational safety measures necessary for safe operation to the area of operations.