Actions aimed at conditioning the area of operations for use as a container terminal, in conditions of safety and compliance with current regulations._x000D_ Replacement, in the area of operations, of asphalt pavement by another HP-40 concrete pavement, in order to adapt it to the new regulations and uses. Without this new pavement it cannot be used as a container terminal complying with the regulations and allowing the stacking of authorised heights. _x000D_ withdrawal of existing bollards, 75 tons of capacity, by bollards of greater bearing capacity, 150 Tn, to meet the needs demanded by the new vessels. _x000D_ endowing, to the dock, with better elements of restraint for the defenses, which will allow to provide a better service to the ships operating on that pier._x000D_ Provide, in the area of operation of the quay, with the necessary operational security measures for a safe operation for the development of the different operations.