The project consists of the installation of a heating system of the tanks through two thermal oil boilers and an internal heating system in the tanks, based on tube heat exchangers, which offer a greater heating surface and better thermal contact, increasing the speed of heat transfer from the heating medium to the receiving medium. The company has calculated that after implementing the system, the production capacity of the product at the delivery temperature will be increased by 50 %.