“The works planned in this action include the creation of two pedestrian and cyclist routes on the roads OU-101 and OU-150 to give greater safety to pedestrians who use these roads. Thus two shared paths separated from the trunk of the road by different elements are projected according to the available space and the needs._x000D_ In the OU-101, at the beginning of the itinerary (P.K. 1+ 020), there is in the right margin a section of low development sidewalk, so the projected path will provide continuity in the itinerary to the shelter of the bus stop (end point of the itinerary P.K. 2+ 310)._x000D_ In the OU-150, at the beginning of the section (P.K. 0+ 000) is the junction with the N-525 in which there are pedestrians from Ourense. The path shall start at this point, continuing by the right margin until P.K. 0+ 960._x000D_»