Kohesio: discover EU projects in your region

project info
Start date: 9 December 2021
End date: 30 November 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 779 814,40 €
EU contribution: 1 779 814,40 € (100%)
programme
Programming period: 2014-2021
Managing authority: Subdirección General de Gestión del FEDER de la Dirección General de Fondos Europeos. Ministerio de Hacienda y Función Pública.
intervention field

PATH IN OU105_A PONTE SEVILLA, OU536_RABAZA AND AVD PONFERRADA (OURENSE)

“The operation consists of the construction of various pedestrian and cyclist routes on the following roads:_x000D_ — OU-105: path in the variable width right margin (minimum 1.80 m), between kilometre points (pp.kk.) 0+ 000 and 0+ 850 approximately, where the detour is located towards the tanatorio As Burgas._x000D_ — OU-536: path in the left margin of variable width (minimum of 1.80 m), between pp.kk. 0+ 790 (passed the crossing with the Camiño de Souto Sanín) and 2+ 320 approximately._x000D_ — Avenida de Ponferrada: path of variable width (minimum of 1.80 m), by the left margin between the pp.kk. 0+ 000 (No. 249 of the Avenida de Buenos Aires) and extends to the roundabout existing in the OU-536.”

Flag of Spain  Ourense, Spain