Kohesio: discover EU projects in your region

project info
Start date: 11 March 2021
End date: 31 March 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 5 636 644,00 €
EU contribution: 4 540 880,50 € (80,56%)
programme
Programming period: 2014-2021
Managing authority: Subdirección General de Gestión del FEDER, de la Dirección General de Fondos Europeos del Ministerio de Hacienda.
intervention field

Punta Tenefé Wind Park

This installation consists of 3_x000D_ wind turbines, all from the manufacturer Enercon, and_x000D_ has a total power of 5.4 MW. Two of the_x000D_ wind turbines are model E-70 with a_x000D_ rated power of 2 300 kW and have a rotor diameter of 71 meters and a tower height of 85 meters, reaching a total height 120.5_x000D_ meters. The other wind turbine is an E-48, with a_x000D_ rated power of 800 kW. It has a rotor diameter of 48 meters and a height of tower_x000D_ of 50 meters, reaching a total height of 74_x000D_ meters.

Flag of Spain  Gran Canaria, Spain