“”THE PRIMARY OBJECTIVE OF THE INVESTMENT PROJECT IS TO MAXIMISE ENERGY EFFICIENCY. TO THIS END, THE FOLLOWING MEASURES HAVE BEEN ENVISAGED: RELAMPING OF THE EXISTING LIGHTING SYSTEM WITH REPLACEMENT OF OBSOLETE LIGHT POINTS WITH LED LIGHTING FIXTURES OF MODERN LOW-EFFICIENCY TECHNOLOGY; EFFICIENCY OF THE EXISTING AIR CONDITIONING SYSTEM WITH REPLACEMENT OF OLD OBSOLETE AIR CONDITIONERS WITH NEW ONES IN HIGH-EFFICIENCY HEAT PUMP (CLASS A+++); INSTALLATION OF A PV PLANT ON A BUILDING, WITH A NOMINAL POWER OF 230 KWP OPERATING UNDER SSP, WHICH PARTIALLY MEETS THE COMPANY’S ENERGY NEEDS, THE SIZING OF THE PLANT HAS BEEN CARRIED OUT IN ORDER TO ENSURE THAT THE ELECTRICITY PRODUCED IS INTENDED PRECISELY FOR SELF-CONSUMPTION; INSTALLING A MONITORING AND BACKUP SYSTEM: DATA COLLECTION AND STORAGE SYSTEM ON THE AMOUNT OF ENERGY PRODUCED BY THE PV SYSTEM OR SAVED BY THE VARIOUS INTERVENTIONS.“”