METHOD OF AUTOMATIC AND INDEPENDENT CONTROL OF THE TEMPERATURE OF THE HEAT PUMP SETPOINT ACCORDING TO THE PREDICTION OF THE THERMAL REQUIREMENT AND THE STATE OF OPERATION OF THE THERMAL POWER PLANT. THE GOAL IS TO MINIMISE THE ENERGY PRODUCED BY EXISTING BOILERS TO MAXIMISE THE ENERGY PRODUCED BY THE HEAT PUMP. MEASURES TO REDUCE THE ENERGY CONSUMPTION OF THE THERMAL POWER PLANT. METHOD OF AUTOMATIC CONTROL OF DEHUMIDIFICATION REQUIREMENTS MANAGED BY AN AIR TREATMENT UNIT AIMED AT REDUCING DEHUMIDIFICATION ACTIVATION HOURS BY REDUCING WORKING HOURS AT PART LOAD. MEASURES TO REDUCE ENERGY CONSUMPTION BY ENSURING AN ACCEPTABLE LEVEL OF ENVIRONMENTAL COMFORT.