AND WHAT ABOUT IT? THE REDEVELOPMENT OF THE THERMAL POWER PLANT IS PLANNED WITH THE REPLACEMENT OF THE TWO EXISTING HEAT GENERATORS. IN PARTICULAR, DO YOU HAVE TO? WASH THE EXISTING PLANT AND THEN EMPTY, CUT THE PIPES AND DISASSEMBLE EXISTING EQUIPMENT INSIDE THE THERMAL PLANT SUCH AS: HEAT GENERATORS, BURNERS, ELECTRIC PUMPS, VALVES, INSULATING COATINGS, CHIMNEYS, ELECTRICAL SYSTEM AND AUTOMATIC REGULATION SYSTEM, SOFTENED WATER TREATMENT PLANT ACCORDING TO ONE 8065.IL NEW HEAT GENERATOR RUNNING FROM INSIDE OF MODULAR SAR TYPE? CONSISTING OF TWO PRE-ASSEMBLED THERMAL MODULES WITH A USEFUL HEAT OUTPUT OF 61 KW AND 86 KW RESPECTIVELY, WITH METAL STRUCTURE TO SUPPORT THE EQUIPMENT, FUME COLLECTOR, WATER AND GAS CONNECTION PIPES, THERMAL INSULATION ACCORDING TO LAW, PRIMARY CIRCUIT ELECTRIC PUMPS, INAIL DEVICES FOR CLOSED POT SYSTEM, EXPANSION VESSEL