Before the project, there is a b. DW 265 from km 19+ 117 to km 34+ 025. As part of the work, it is envisaged, among others, reinforcements with its replacement, renovation of culverts, autob bays, crossroads, pavements, lighting, drainage, green planting, downhills. The material scope of the investment confirms that the project will affect the situation on the roads of the voivodeship. — pop. kom. between Bydgoszcz and Toruń and Płock; — pop. road traffic and war of driving; strengthening the development of human resources through mobility and population travel and the creation of new employment opportunities; shortening the journey time on the front section of the road; a significant minimum of the cost of the explosion of motor vehicles and the prevention of excessive wear; reduction of the negative impact on the environment (reduction of pollutant emissions and noise due to numerous vehicle downtimes), improvement of the acoustic climate of the district of Włocław; improvement of access to designated investment areas located a short distance from DW 265. The investment will contribute to the following indicators: a) The product: Length of rebuilt voivodeship roads – 14.91 km; result: Voivodship road load index – 115 kN/axle. DW 265 ensures the region’s connectivity with the external communication system (connected to the TEN-T network). It is an important element of the road network constituting the connection between Bydgoszcz and Toruń (through the national road no. 91 and 62) with Płock and is a bypass of the voivodeship road 62 Włocławek – Płock. In the area of Kruszyn, the road crosses the A1 motorway.The total value of the project is PLN 37 319 594,32 and it constitutes only eligible expenditure. EU funding will amount to 95 % of the costs, i.e. 35 453 614.60 PLN.