Start date: 28 September 2018
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 128 426,80 €
EU contribution: 3 509 162,80 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Reconstruction of the road voivodeship. 758 p. Ujazd – border of the municipality of Iwaniska from km 3+ 640 to km 7+ 058

The subject of the project is “Reconstruction of the road voivodeship”. 758 p. Ujazd – the border of the municipality of Iwaniska from km 3 + 640 to km 7 + 058", based on the project documentation entitled “Ujazd”. “Expansion of voivodeship road No 758 to section 1 Ujazd – Koprzywnica from Ujazd in approx. 3+ 640 to the border of the municipality of Iwaniska km approx. 7 + 027”. The planned investment is located in the Opatów district, Iwaniska commune, in the eastern part of the St. Mary’s Voivodeship, within DW758 connecting Iwaniska – Klimontów – Koprzywnica – Ciszyca to the distance from Ujazd in approx. 3+ 618 to the border of Iwaniska km approx. 7 + 058. The road runs in the vicinity of undeveloped areas with agricultural management and forest areas. It starts at the border m. Ride in km 3 + 618,17 DW758 and ends at the border of Iwaniska in km 7 + 056,08 DW 758. The Techn Parameters: class G, single carriageway, two lane with roadway width. 7.0 m (2x3.5 m), groundsides by width. 2.50 m (2x1.25 m), slopes in the place of the ground slopes by width. 1.5 m (2x0.75 m), bicycle path by width. 2.5 m (with ground side by width. 0.5 m), sidewalks by width. 2.28 m (including 2.0 m pavement, 0.08 m rim, 0.2 m curb), bus bays. Surface load capacity 115kN/axle. Material scope: expansion of the DW758 to the length of the DW758. 3.43 km, construction and reconstruction of drainage, construction of bus bays and sidewalks, reconstruction of intersections with subordinate roads, construction/reconstruction of individual and public exits, performance of vertical and horizontal markings and road safety elements. The project is in line with the specific objective of Measure 5.1 Road Infrastructure of the Regional Operational Programme Świętokrzyskie 2014-2020 – increased transport accessibility and improved security of the regional network complementing the TEN-T network under investment priority 7b – increasing regional mobility by connecting secondary and tertiary nodes with TEN-T infrastructure, including multimodal nodes, as the rebuilt road will have a load capacity of 115kN/axle.