project info
Start date: 27 March 2023
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 881 157,20 €
EU contribution: 2 328 694,20 € (60%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Warmińsko-Mazurskiego
European Commission Topic

Energy Business – Photovoltaic Farm and Heat Pump

The subject of the project is the construction of a photovoltaic farm with a capacity of about 900 kW (the project assumes the installation of 2814 pa.o of 320W power) in the public area of the airport and carports with a capacity of up to 50 kW (150 pa.o of power 310 W) in the parking zone in the vicinity of the passenger terminal. The project includes the construction of five ground pumps: building no. 8:108 kW, tower building:108 kW and 200 kW (cascade pump), terminal building:700 kW, hangar building: 374 kW and one air pump (LSRG:10 kW building) supplying thermal energy to the Beneficiary’s buildings (pumps). And the preparatory stage: Selection of the contractor for the pumps. Selection of the contractor for the PV farm and carports; Second stage of pump construction: Demolition works in buildings; Earthworks (execution of vertical ground exchangers); Assembly works (assembly of pipelines, manifold wells, heat pumps and heat buffers, installations and measurements); Stage II of the construction of the PV farm: Preparation of the site for the installation of supporting structures and the ordering of the construction site; Arrangement of supporting structures of freestanding solar cells; Setting and connecting freestanding solar cells; Construction of cable sewerage – electrical cables and cables of free-standing solar cells; Transformer stations; CCTV – installation of a monitoring system; Construction of external fence (fundaments, erecting fences), installation of cameras on the fence; Installation of lightning protection systems; Surveying of investments. Stage III: Pick up the pumps. Receipt of the PV farm together with the reception by Energa Operator. As part of the project, a PV farm will be installed allowing the use of electricity for own needs, carports and pumps protecting the heating of key buildings of the Airport, using energy from renewable sources. The project is directly in line with Action 4.1 of the SZOOP, Annex. 4 List of projects identified by the relevant institution Detailed Description of the Priority Axis Energy Efficiency for 2014-2020.

Flag of Poland  Poland