Kohesio: discover EU projects in your region

project info
Start date: 17 December 2021
End date: 30 June 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 194 536,10 €
EU contribution: 1 015 355,75 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji
European Commission Topic

Thermomodernisation of the building of the Municipal Social Welfare Centre in Chodzieża

The subject of the project is the thermomodernisation of the building of the Municipal Social Welfare Centre in Chodzieża.Scope of works:- modernisation of the c.o. installation – improvement of the heating installation consisting of dismantling the old and carrying out a new installation; — replacement of doors with a heat transfer coefficient for the whole set of not more than Uwlt;=1.3 W/m2xK;- replacement of windows with a heat transfer coefficient of not more than Uwlt;=0.9 W/m2xK;- insulating the roof with a thickness of 20 cm minimum and a heat conductivity coefficient of not more than 0.0 36 W/mK;- insulation of external walls using the BSO method with styrofoam with a thickness of 15 cm and a heat conductivity coefficient of not more than 0.033 W/mK;- modernisation of the c.w.u. installation – dismantling of the existing and construction of a new installation;- insulating external pedestal walls and in the basement with extruded styrofoam gr 15 cm and a heat conductivity coefficient of not more than 0.0 32 W/mK;- warming of the floor on 590.35 m² hard/floor polystyrene with a thickness of 10 cm and a heat conductivity coefficient of not more than 0.037 W/mK;- installation of a PV installation with a power of 19.9 kW;- modernisation of the lighting system;- associated renovation works (which constitutes an ineligible cost in full) – indicated in point. 3.4 and V.1 SW.The scope of the project also includes the preparation of a feasibility study, preparation of technical documentation, development of energy and lighting audit, investor supervision and information and promotion activities.The material effects of project implementation are (year 2023):- Number of energy upgraded buildings – 1 pc;- Use area of buildings subjected to thermal modernisation – 1 594.82 m²;- Additional capacity to generate electricity from renewable sources – 0,0199 MWe;- Number of electricity generation units built from renewable energy sources – 1 pc.

Flag of Poland  Poland