Start date: 1 December 2022
End date: 30 June 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 212 304,80 €
EU contribution: 1 030 459,06 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Wielkopolskiego obsługiwany przez Urząd Marszałkowski, Departamenty: Polityki Regionalnej, Wdrażania Programu Regionalnego, Wdrażania Europejskiego Funduszu Społecznego, Biuro Certyfikacji i Windykacji

Thermomodernisation of the Gen. Gen. Primary School building Józef Dowbora Muśnicki in Lusów

The project consists of a comprehensive deep modernisation of the power plant of the SP building in Lusów, including works resulting from the energy audit and lighting. The building requires an increase in the thermal insulation of the external walls, the roof of the building and floors planted on the ground together with the replacement of window and door joinery. It is planned to replace the gas boiler room with pumped water and heat pumps. All radiators will be equipped with thermostatic valves. The sports room will be heated with modern rooftop heaters and air conditioning is foreseen in the classrooms. The project also provides for the replacement of lighting and installation of photovoltaic installations on the roof of the building. Thermomodern works, including: insulation and warming, replacement of joinery and external locksmiths, reconstruction works2. Modernisation of the ventilation system3. Modernisation of the heating system and vivo4. Replacement of lighting for energy5. Installation of air conditioning6. Installation of RES7. Investor supervision8. The period of implementation 1.12.2022-30.06.2023The project will contribute to the achievement of the objective of: increase of the effective energy of the publ sector and the use of RES in the infrastructure of publThe planned material effects (products) of the project:Number of modern energy of buildings – 1 pcsThe area of use of buildings subjected to thermal energy – 3349,15 m2Number of modernisation of heat sources – 1 pcsAdditional capacity to produce electricity from renewable energy – 0,0366 MWeAdditional capacity to produce heat energy from renewable energy – 0,0488 MWtNumber of production units of heat energy from renewable energy – 2 pcs PLN 7219977,33 of which ineligible PLN 2 168 707.581 m² in the school building is rented for a vending machine with drinks – the rate of rented areas to the total area is 0.023 %, therefore 0.023 % of the project costs were transferred to ineligible costs. In addition, the warming of the outer walls and the floor on the ground of gymnast and connector are ineligible due to the too long payback time for investments.