The operation aims to rehabilitate the 28-unit building, with necessary upgrades (fire safety, electrical, accessibility, etc.), the improvement of the comfort and living environment of residents, as well as the renovations of the fence and the canopy that were necessary. The operation includes a strong energy component with the transition from an energy label F before work to a B label after work and the achievement of the BBC renovation level.