CACL wishes to strengthen the distribution of drinking water in the Matiti sector at the entrance of the production and drinking water supply plant in Macouria. To this end, it provides for the extension of its AEP network in order to serve a hamlet located near the plant which cannot be supplied directly to the processing unit due to the excessive pressure. To do this, some equipment will have to be installed (pressure reducers and secondary supply network).