The general objective of the project is to increase the capacity of Constanta Port in order to achieve time savings when transporting goods and, in particular, perishable ones. Increasing the capacity of the road infrastructure in the port will reduce congestion on the road network inside the port and on the access roads in the port, facilitating access to the quay or areas of loading/unloading and temporary storage of goods. Thus, the implementation of the proposed project will contribute to the achievement of the objectives of liop on increasing the use of waterways and ports located on the central TEN-T network. The project will demonstrate the contribution to programme indicator 1.3. Upgraded TEN-T ports – 2S6