The operation, carried out by the CD63, aims to secure the crossing of the river “Switzerland” through the creation of a pedestrian and cycling bridge. Indeed, today the passage on the river is carried out via a road bridge (RD7), very dangerous for the circulation of bicycles and pedestrians (low width, speed of vehicles...). The project is part of the continuity of the V71 but also that of the V73 which connects the territory to the Rhone (Via Rhôna) The operation is eligible for action 6 of the ERDF LOIRE POI