The 20 individual accommodation units are located in Cabourg. Wood frame construction dates back to 1988. These are agreed dwellings. The consultation was launched on 25 June 2019 with the following lots: Lot 1: asbestos removal – cover Lot 2: wood structure and cladding Lot 3: exterior joinery – metalwork Lot 4: interior joinery Lot 5: floor covering – paint Lot 6: plumbing – heating – ventilation Lot 7: electricity The programme is currently on energy label E. The rehabilitation works will obtain the HPE label and the housing will be BBC.