The material scope of the project includes the execution of works related to the construction of the power station 220/110 kV Nysa (including the necessary infrastructure), the construction of the 220 kV line (incision of the Ząbkowice – Groszowice line with a length of about 200 m) with the introduction of this line to the new station and the delivery and installation of the autotransformer.