The subject of the project is the construction of 12 units of renewable energy installations for the needs of public buildings in Luban Municipality, of which: new installations will be installed on the 7 following buildings: —Water treatment plant in the Upper Probostwo – well no. 4, with a power of 20.25 kWp,-Pumping station No. 5 in Mikanów, with a power of 13.95 kWp,-Pump pumping station No. 6 in Luban, with a power of 1.8 kWp,-Supplier No. 2 in the Lower Probe, with a power of 9.45 kWp,-Water Treatment Station in Kałęczynek, with a capacity of 9.45 kWp,-Village Light in Ustroń, with a capacity of 7.2 kWp,-Village Light in Janowice, with a capacity of 11.7 kWp, 5 of the following buildings, the extension of the existing installations is planned: with a capacity of 34.65 kWp,-Building of the Municipality Office in Luban, with a capacity of 11.7 kWp,-Municipal Centre of Culture in Luban, with a capacity of 20.25 kWp,-Basic School in Luban, with a capacity of 7.2 kWp,-Basic School in Luban (building of the former Gymnasium), with a capacity of 20.25 kWp. Its implementation will reduce the problem of low use of renewable energy and excessive emissions of pollutants into the atmosphere. The main objective of the project is to increase the share of energy from renewable sources in energy production in the voivodship and to increase energy efficiency through the installation of photovoltaic panels in the Luban Municipality.