Kohesio: discover EU projects in your region

project info
Start date: 31 August 2023
End date: 29 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 499 925,94 €
EU contribution: 424 937,06 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podlaskiego
European Commission Topic

Modernisation of street lighting in Wasilków – ETAP II

The subject of the project is the modernisation of street lighting in the city of Wasilków – ETAP II. Scope of investment: 1. Replacement of the existing AL line with the designed AsXSn 4x16mm² – L 12990(13509)m.,2. Replacement of existing luminaires – 648 pcs.,3. Installation of lighting cabinets on existing poles – 2 kpl.,4. Renovation of existing lighting poles on ul. Pine – 6 kpl.,5. Installation of street lighting controller in existing lighting cabinets – 25 pcs. (assembled lighting controllers will be equipped with a communication module (GSM, GPRS); GPS receiver; astronomical clock; ability to work in photocell mode; event recorder; service connector; control and management system). It is planned to replace light sources with designed energy-saving LEDs (luminaires with the possibility of reducing light output by 50 % in hours). 23:00 to 5:00). Replacing existing sodium sources with modern energy-efficient LED luminaires will contribute to lower electricity consumption, which is part of green measures contributing to energy saving and reducing greenhouse gas production, having a positive impact on climate change. The environmental effect achieved will be measurable – the investment will reduce CO2 by 84.65 MWh/year (51.29 %) and reduce energy consumption by 104.25 MWh/year. The implementation of the investment will improve their quality of life and increase public safety. The project is addressed in particular to the inhabitants of the city of Wasilków, who are the direct recipient. However, the products of the Project will be used by all residents of the Municipality and other users of the infrastructure. The investment is part of PGN’s assumptions for Wasilków commune (...) by 2020. The municipality is also a member of the Pow Energy Cluster. It’s Bialystok. Project implementation period: 24.07-29.12.2023. The total value of the project is: 2 519 556.10 PLN. Eligible costs: 2 083 024.80 PLN. Amount of co-financing: 1 770 571.08 PLN.

Flag of Poland  Białostocki, Poland