The aim of the project is to improve air quality in the Chęciny Municipality by reducing pollutants to the atmosphere and increasing the energy efficiency of the building of the Local Government Plant of Basic Health Care in Chęciny. The scope of work includes: insulation of external walls, walls on the ground, external ceiling, ceiling of the interior attic, replacement of window and door joinery, installation of photovoltaic installation. The objectives of the project are aligned with the objectives of Priority Axis 6 for investment priority 4c – promoting energy efficiency in smart energy management and the use of renewable energy sources in public infrastructure, including public buildings and the housing sector of the NFA. The project is implemented within the NFAs and is included in the list of projects planned for implementation within the framework of the IIT KOF Strategy for 2014-2020. The project is planned as a full comprehensive energy modernisation of the building, used as SZPOZ in Chęciny. Indicators: Amount of electricity saved 0.00 MWh/year; Amount of thermal energy saved 336.32 GJ/year; Reduction of final energy consumption as a result of 449.10 GJ/year projects; Estimated annual decrease in greenhouse gas emissions 45.58 tonnes equivalent/CO2/year; Reduction of annual primary energy consumption in public buildings 196 750.36 kWh/year; Number of energy upgraded buildings 1pcs; Usable area of buildings subjected to thermal modernisation 952.20 m².Number of built units of electricity generation from renewable energy – 1 pcs.