Kohesio: discover EU projects in your region

project info
Start date: 28 June 2023
End date: 29 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 307 400,80 €
EU contribution: 236 224,98 € (76,85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski

“Modernisation of the street lighting system in the City of Stargard Municipality – stage II”

Analysed projects: “Modernisation of the street lighting system in the City of Stargard Municipality – stage II” includes: 1. dismantling: —28 existing lighting poles with overhead line; —29 existing sodium luminaires; —1 of the existing lighting cabinet; 2. Assembly: —54 new lighting poles; —55 new LED luminaires (of different power); —1 a new lighting cabinet, which enables independent control of the system through an astronomical clock, which is used to switch on and off street lighting according to daily astronomical sunrise and sunset points and has the ability to shorten the lighting time, allowing for significant savings in electricity consumption; 3. Reconstitution: —one-sided pavement on ul. Resides I. – Stages of implementation (all within 2023)--- – Preparatory work: Q2 Obtaining the required permits: Q2 Announcement of a tender for the execution of an investment task: Q2 — Implementation of lighting modernisation, including reconstruction works: II-III-Q4 Project management: II-III-Q4 Archaeological surveillance: II-III-Q4 —Promotion of the project: II-III-Q4 Final acceptance of works: Q4 Final statement: Q4 — – – the applicant has technical, human resources and knowledge within the described financial and administrative structures to ensure that the infrastructure is operational immediately after the end of the project (details: SW 3.2). Compliance of the draft with the provisions of point 1.2 of the Rules of Recruitment: eco-awareness projects (Type 3); modernisation of urban lighting in the urban area towards its energy efficiency (type 3a); project implemented within the framework of the ITI SOM Strategy; actions in the area for which the Low-Emission Economy Plan has been created; 100 % of the street lighting system “Old Town in Stargard” will be upgraded (definition of the system: SW 2.1.1.1).

Flag of Poland  Szczeciński, Poland