The construction is the nature of the reconstruction of the existing railway line in the existing railway body. The construction is located on the two-track national line Blažovice – Brno hl.n. no. 318A (according to TTP), No. 340 (according to KJŘ) in the section Šlapanice – Brno-Slatina. The line is electrified by AC traction 25 kV, 50 Hz. The current line speed in the construction section is 80 km/h (Brno-Slatina [ZV] from km 7.004 to km 15.587 [ZV] Blažovice), the braking distance is 700 m, the line load class is C3.