Kohesio: discover EU projects in your region

project info
Start date: 18 September 2020
End date: 31 March 2023
funding
Fund: European Regional Development Fund (ERDF)
programme
Programming period: 2014-2020
Managing authority: Ministerium für Wirtschaft, Arbeit, Verkehr und Technologie des Landes Schleswig-Holstein, Referat VII21 Regional- und Strukturpolitik, EFRE, GRW, EU-Angelegenheiten
European Commission Topic

Local heating supply Mühlenberg Nord

The city of Neustadt in Holstein has about 15.000 inhabitants. The project of sustainable energy and heat supply envisages fully supplying the settlements of Mühlenberg Nord with heat via a local heating network. For supply in the current supply area, 37 heat consumers are to be supplied with connection capacities of up to 126 kW and a peak load of about 1.6 MWth. These are mainly new residential buildings with a building standard according to KfW 55 (investor), as well as a kindergarten (stock) and a daycare centre (new building). For the heat supply of KfW 55 buildings, a primary energy factor of a maximum of 0.3 is required in the heating network. The local heating network with a total length of 2.13 km is to be built in 3 construction phases by 2023. 70 % of the useful heat demand of 2.550 MWh is met by renewable energy sources and the use of cogeneration. A 25 m³ buffer tank is used to smooth the load paths. The peak demand of 30 % of the total heat demand is provided by a peak load and redundancy boiler system.

Flag of Germany  Ostholstein, Germany