Kohesio: discover EU projects in your region

project info
Start date: 1 July 2022
End date: 30 June 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 954 042,13 €
EU contribution: 312 845,30 € (32,79%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Energy renovation of SICECO

As part of its energy management policy, the SICECO Côte-d’Or energy territory is renovating its building. This comprehensive and ambitious energy renovation will make it possible to achieve carbon neutrality and reduce real consumption by 60% before 2050, as required by the "Eco-Energy Tertiary" decree. The works will comply with the Effilogis technical specifications of the Burgundy-Franche-Comté Region (performance level Ref -60%) and include the use of bio-based materials. With this project, SICECO has fully demonstrated its desire to demonstrate and set a territorial example: - By the quality of the materials used and the execution of the works, - On the savings generated in operating budget, with the monitoring and maintenance of these, - On the necessary support to the local economy. For its design phases and its work, SICECO is accompanied by an architect and a thermal design office. The works include the reinforcement of the building's roof insulation and the installation of bio-based wood insulation on the exterior walls. Air quality will be improved with the installation of a dual-flow ventilation unit and special care will be taken with the air tightness of the envelope. Electricity consumption will be offset by the installation of photovoltaic solar panels.

Flag of France  Côte-d’Or, France