The project contributes directly to the objectives of the programme under Axis 3: "Catching up the structural backwardness of the territory in terms of transport infrastructure", more particularly OS3.2, which aims to modernize port infrastructure. The main objective of this phase of the project is to ensure the operation of the port cranes, with three main actions to be carried out to ensure their proper functioning and integration into port operations. - Testing (positive suitability check) - gradual commissioning (regular service check) - training of crane operators The final phase for the commissioning of cranes is a critical process to ensure that the newly installed infrastructure fully meets expectations. The technical tests, the gradual commissioning, and the training of crane operators are three essential steps to ensure that the cranes can be used optimally and safely in the port operations of the port of Dégrad-des-Cannes.