Start date: 1 June 2024
End date: 30 June 2026
funding
Fund: Just Transition Fund (JTF)
Total budget: 3 675 705,71 €
EU contribution: 2 537 982,90 € (70%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Thermomodernization of two public buildings of the Municipality of Świdnica: the Municipal Office and the Civil Registry Office located in Świdnica at ul. the Home Army 47 - 49

The subject of the project is thermomodernization of two public buildings belonging to the Municipality of Świdnica, i.e.: the building of the Municipal Office (hereinafter referred to as "UM") and the building of the Civil Registry Office (hereinafter referred to as "USC") located in Świdnica at ul. Home Army 47-49. As part of the investment, it is planned to perform thermomodernization improvements in both of the above-mentioned facilities consisting in: replacement of door joinery, replacement of window joinery with installation of light breakers and insulation of external walls. In addition, the UM building provides for insulation of the ceiling under the attic and the roof of the building. In turn, the USC building is also planned to insulate the ventilated and non-ventilated roof and install a photovoltaic micro-installation with a capacity of 41.25kW on the roof (29kWp for the UM building, 12.25 kWp for the USC building). This will achieve the project’s direct objective of increasing the energy efficiency of buildings (primary and final energy savings) and reducing greenhouse gas (CO2) emissions. The use of PV installations will also increase the share of RES in the energy balances of facilities. As part of the investment, it is also planned to carry out works in buildings other than the above-mentioned ones, which will serve to increase the accessibility of facilities for people with disabilities, improve their aesthetics and improve their functionality and technical condition, which will affect the safety and comfort of their users. In the long term, the project will contribute to the following environmental, social and economic benefits: 1) ECOLOGICAL: improving air quality (reducing emissions of harmful dusts and gases), combating the greenhouse effect, improving the condition of ecosystems. 2) ECONOMIC: reducing JTS expenditure on the maintenance of buildings and thus improving its financial situation, increasing energy security, reducing dependence on fossil fuel markets, reducing imports of coal, gas and electricity. 3) SOCIAL: improving the health of the population (reducing cancer, respiratory and cardiological diseases), increasing the attractiveness of the city in terms of investment and tourism. Those planned actions and their effects shall be consistent with the objectives of the FEDS 2021-2027, in particular the specific objective of action FST.CP6.I, as they contribute to the achievement of the Union’s 2030 targets for energy and climate and for a climate-neutral economy, as well as to mitigating the effects of the environmental transition. The applicant shall have energy efficiency audits for buildings and all necessary design documentation. For the investment, a valid building permit was obtained. The applicant, investor and beneficiary of the project is the Municipality of the City of Świdnica, which will be responsible for the project at all its stages: preparation, implementation, settlement and sustainability. It will also be the operator of the co-financed infrastructure In the project there are no partners/implementing entities. The beneficiary will carry out information and promotion activities of the project in accordance with the FEDS 2021-2027 guidelines, the purpose of which is to inform the public about the funding received (information board, information on the applicant’s website, marking documents related to the implementation of the project).

Flag of Poland  Wałbrzyski, Poland