The project includes the extension of the road No. 160 of the Drezdenko - Międzychód route (on the section Rąpin-province border) to class G on the section with a total length of 5.75 km and its adaptation to a load capacity of 11.5 tonnes/axle. It will be implemented in the build formula. The project implements Policy Objective CP3 A better connected Europe by enhancing mobility, Specific Objective Action FELB.04.01 Road infrastructure ERDF/CF.CP3.II - Developing and improving sustainable, climate-resilient, smart and intermodal mobility at national, regional and local level, including improving access to TEN-T and cross-border mobility. The aim of the project is to develop sustainable mobility based on regional road infrastructure, improving traffic conditions on roads, including increasing traffic safety, increasing the mobility of residents (facilitating access to the labour market, social, cultural services or education). This investment is of strategic importance for the improvement of traffic conditions and further development of the region. The implementation of the extension of the DW 160 will improve the passage on the section constituting a direct connection with the national road No 24 connected with the S3 expressway at the Skwierzyna Południe junction. The project provides convenience in access to higher category roads, including the TEN-T network (A2 motorway) as well as the provincial city of Gorzów Wlkp. The implementation of the investment will reduce emissions to the environment, as well as provide a significant improvement in traffic safety. The project will improve the regional and local transport system, increase the comfort of travel, promote the performance of public transport services of public interest, which will increase the number of users of the rebuilt infrastructure. The project will directly contribute to increasing the competitiveness of the region by improving the availability of road infrastructure, which will also have a positive impact on the functioning of economic activity. It is assumed that the following tasks will be carried out: 1.Design documentation Developed design documentation for the investment and obtained the necessary permits for the implementation of construction works. 2.Feasibility Study Developed Feasibility Study and application form. 3.Acquisition of land As part of the project, land was acquired for the planned expansion of DW 160. 4.Promotion of the project The project assumes carrying out promotional and information activities, including information boards, organizing an event or information and promotion activity at an important moment of the project implementation and other promotional activities, including social media and regional media. Documents related to the implemented project, in particular those that will be made public, will bear signs: European Funds, colours of the Republic of Poland and the European Union and the official promotional logo of the voivodship. The planned promotional activities will be in accordance with the provisions of the Guidelines on information and promotion of European Funds for 2021-2027. 5.Construction works The extension of provincial road No 160 on the section Rąpin – provincial border in km 75+150 to km 80+900 includes: - extension of the DW 160 roadway to W 7,0 m, - budowę ciągu pieszego, - budowę zatok autobusowych, - budowę zatoki do ważenia pojazdów, - przebudowę istniejących zjazdów, - rozbiórkę istniejącego i budowę nowych przepustów pod koroną drogi i ciągami pieszymi, - oczyszczenie rowów i przepustów pod zjazdami, - budowę elementów odwodnienia drogi (rowy drogowe), - przebudowę istniejącego oświetlenia (przy istniejących przystankach autobusowych), - budowę oświetlenia (przy przejściach dla pieszych), - przebudowę/budowę kolidujących istniejących urządzeń infrastruktury technicznej - sieć teletechniczna i elektroenergetyczna, - nasadzenia drzew. The project will be implemented by the Board of Provincial Roads in Zielona Góra.