The project involves the reconstruction and reinforcement of provincial road No 278 on the Sulechów – Konotop section, class Z on the section with a total length of 11.562 km and its adaptation to a load capacity of 11.5 tonnes/axle. It will be implemented in the build formula. The project implements Policy Objective CP3 A better connected Europe by enhancing mobility, Specific Objective Action FELB.04.01 Road infrastructure ERDF/CF.CP3.II - Developing and improving sustainable, climate-resilient, smart and intermodal mobility at national, regional and local level, including improving access to TEN-T and cross-border mobility. The aim of the project is to develop sustainable mobility based on regional road infrastructure, improving traffic conditions on roads, including increasing traffic safety, increasing the mobility of residents (facilitating access to the labour market, social, cultural services or education). This investment is of strategic importance for the improvement of traffic conditions and further development of the region. The implementation of the reconstruction of DW 278 will improve the passage on the section constituting a direct connection with the S3 expressway at the Sulechów junction. The project provides convenience in access to higher category roads, including the TEN-T network (A2 motorway), as well as to the provincial city, i.e. Zielona Góra. The implementation of the investment will reduce emissions to the environment, as well as provide a significant improvement in traffic safety. The project will improve the regional and local transport system, increase the comfort of travel, promote the performance of public transport services of public interest, which will increase the number of users of the rebuilt infrastructure. The project will directly contribute to increasing the competitiveness of the region by improving the availability of road infrastructure, which will also have a positive impact on the functioning of economic activity. It is assumed that the following tasks will be carried out: 1.Design documentation - developed design documentation for the investment and obtained the necessary permits for the implementation of construction works. 2.Feasibility Study - prepared Feasibility Study and application form. 3.Promotion of the project The project assumes carrying out promotional and information activities, including information boards, organizing an event or information and promotion activity at an important moment of the project implementation and other promotional activities, including social media and regional media. Documents related to the implemented project, in particular those that will be made public, will bear signs: European Funds, colours of the Republic of Poland and the European Union and the official promotional logo of the voivodship. The planned promotional activities will be in accordance with the provisions of the Guidelines on information and promotion of European Funds for 2021-2027. 4.Construction works The task includes the implementation of construction and assembly works on 4 sections of the provincial road No. 278: – Section Kruszyna – Radowice in km 29+461 – 34+850 with a length of 5.389km – Section Trzebiechów – Klenica in km 39+877 – 42+100 with a length of 2.223 km – Section Trzebiechów – Klenica in km 42+100 – 43+250 with a length of 1.150 km – Section Klenica – Wirówek in km 45+000 – 47+800 with a length of 2.800 km. The following sections are planned: reconstruction and reinforcement of the provincial road no. 278, construction of exits, sidewalks, pedestrian-bicycle track, roadside ditches, culverts, lighting, an island slowing down traffic, bus bays, reconstruction of intersections, installation of safety elements and traffic organization, reconstruction of infrastructure interfering with the investment. The project will be implemented by the Board of Provincial Roads in Zielona Góra.