The investment concerns a building located in Warsaw, in the Ochota district, at 1 L. Pasteura Street. The building is under conservation protection, it is entered in the Municipal Register of Monuments of the Capital City of Warsaw, under number 3246, ID: OCH05421, as a result of the incorporation order of 24 July 2012 as the former Radical Institute II. The main objective of the project is to improve air quality in the area of the Capital City of Warsaw by reducing surface emissions (low emissions) from a public utility building by 462.5 tonnes of CO2/year and increasing the energy efficiency of a historic building for education and science, thanks to its deep energy modernisation (area subject to a change in the heating method of 17,700.9 m2). The material scope of the project resulting from the ex ante audit includes: - replacement of the heat source with a dual-function (c.o., c.w.u.) heat node powered by the municipal heat network, - installation of a new heat node, - installation of a new mechanical supply ventilation system with heat recovery, - insulation of external walls and ceilings, - replacement of external windows and doors, - modernisation of the C.O. installation - modernisation of the c.w.u. - replacement of lighting with LED, - purchase and installation of a fire alarm system. as well as ineligible costs: renovation of balconies, stairs, retaining walls, construction of lightning protection system, roof repair. As part of the task, a photovoltaic installation is also planned, working for the building's own needs, with a total capacity of 50.0 kWp. - Awareness-raising for building occupants – educational activities (international conference with foreign partners including exchange of experience). In parallel to the above-mentioned works, investor supervision services will be carried out, separately for sanitary works and separately for other works, mandatory promotional activities and indirect costs incurred. In the project there are also ineligible costs covering partially VAT% against which the Applicant has no legal possibility of recovery and works: renovation of balconies, stairs, retaining walls, construction of lightning protection system. The starting date of the project was 01.01.2021 as the date of the first payment in the project (the cost of updating the energy audit). Part of the work is underway. In the second quarter of 2024, the project application documentation (feasibility study, application application) and energy audit, PV and lighting replacement as well as ornithological expertise were developed. The project is legally feasible: The applicant has the right to dispose of the property for construction purposes, energy audit and recommendations of the Mazowieckie Provincial Conservator of Monuments of 20 March 2024, ref. WZWL.5183.282.2024.EK.