The project covered by the Application for co-financing is implemented within the currently applicable limits of the Warsaw agglomeration of 1 963 113 p.e., designated by Resolution No LXXIII/2447/2022 of the Warsaw City Council of 8 December 2022 amending the resolution on the designation of the area and boundaries of the Warsaw agglomeration. The agglomeration does not meet any of the conditions of the Waste Water Directive in accordance with the 6th National Environmental Protection Act, and this project contributes directly to meeting these conditions by increasing the p.e. connected to the sanitary sewerage system. As part of this project, one task is carried out consisting in the construction of a sanitary sewerage system in the gravitational system at ul. Fir in Mościska. As part of the above tasks, the following material scope will be implemented: a) gravitational channel DN200 – 409,10 m, b) gravitational channel DN160 – 85,60 m. The sewage from the new sewage system will be discharged with a Czajka treatment plant with a maximum capacity of 2,1 million p.e. The project plans to connect 60 people, which is 60 p.e. The notified scope of the project constitutes a sewage network within the meaning of the Act on collective water supply and collective waste water disposal.