The aim of the project (proj) is to improve the quality of psychiatric services provided by the network of psychiatric institutions for adults - Mental Health Centres (hereinafter: CZP) and community psychological and psychotherapeutic care centres/teams for children and adolescents (hereinafter: And level) by supporting the infrastructure of the outlets. The planned project will increase the efficiency of the health care system and will contribute to eliminating regional differences in the quality of health services in the field of psychiatry. And levels are the basis of a new model of protecting the healthy psyche of children and adolescents, disseminating the environmental help of specialists. These entities have been operating since 2020 and have not previously received infrastructure support of this type. CZPs provide comprehensive, multi-stakeholder and universally accessible health care, supporting 51% of the adult population. It is planned to develop a system based on CZP. Supporting these institutions is the most effective way to support the psychiatric system. The project will be implemented in the grant formula. The planned outcome of the project is to improve the quality of health care by supporting the reform of adult, child and adolescent psychiatry. The result will be achieved by strengthening the infrastructure of service providers. It is planned to support 100 CZP and 317 I levels. Grantees (gb) will be able to apply for funding in the following areas: • construction works, including adaptation to the needs of persons with disabilities • purchase of social and living equipment, including equipment adapted to the needs of persons with disabilities (ON) and office and administrative • purchase/installation of monitoring equipment, IT and telecommunications infrastructure, including induction loops, medical equipment and diagnostic tools, therapeutic aids, means of transport necessary to provide environmental health services. Under grants, the preferred means of transport will be electric vehicles, however, if gb proves the lack of adequate infrastructure for the use of an electric car, it is allowed to purchase a car with instrumentation (charger). If it is not technically possible to install and use such a charger, then it will be possible to purchase a car with a hybrid drive. Stages of project implementation: 1. Preparation of the grant application (WoD) Preparation of the WoD, taking into account the analyses necessary to prepare the project concept, including its budget. As part of this stage, the following were carried out: Investment needs survey I level and CZP; consultation of the criteria for the selection of children and adolescents in the field of psychiatry and psychiatry, other documents necessary for the elaboration of the WoD). 2. Submission of WoD Submission of WoD on time, making any amendments to WoD. 3. Activity 3 (Information and promotion) Carrying out information and promotion activities under the project: development of information and promotional materials for gb (in two variants for level I entities and CZP), publication of information on project on the Internet; information and promotion conference before the grant call, during which the participants will be acquainted with the assumptions of the project and the conditions for joining the project; information conference summarizing the implementation of the project. 4. Preparatory part of Tasks 1 and 2 Actions necessary after the implementation of GB calls, including preparation of: - grant project regulations for gb (in two variants) - a model contract with gb in two variants - two application forms - two versions of the instructions for filling in the grant application - vacancy notice - the work of the project team and the provision of project 5 staff. Implementation part of tasks 1 and 2 - announcement of the grant call; - selection of gb in accordance with the selection criteria; - signing contracts with selected gb; - realization of grant projects by gb; - ongoing contact with the Ministry of Finance and coordination of activities related to the implementation of grants on the part of the grantor - settlement of agreements with the Ministry of Finance.