Kohesio: discover EU projects in your region

project info
Start date: 5 May 2022
End date: 31 December 2025
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 848 066,41 €
EU contribution: 649 768,81 € (85%)
programme
Programming period: 2021-2027
beneficiary
European Commission Topic
European Commission Topic

Construction, extension and reconstruction of the water supply network along with the expansion and modernization of water treatment stations in the Frysztak commune

The main objective is to organize water management and improve socio-economic conditions in the municipality. The implementation of the project will bring many long-term benefits and the following specific objectives will be achieved through the actions undertaken: - improving the living conditions of residents by expanding the systems and ensuring reliable water supply - providing residents with access to high-quality drinking water - modernising and improving the efficiency of the water supply system - increasing the area supplied with water from the water supply - creating conditions for the development of tourism and agritourism - increasing the investment attractiveness of the municipality leading to the creation of new jobs - increasing the ecological awareness of residents. SMART analysis, which allows you to check the set objectives in terms of impact indicators. Specyfic (specific) - The main objective of the project is to organize water management and improve socio-economic conditions in the municipality. Measurable - As a result of the project, one water supply station with technical infrastructure will be rebuilt in the municipality and a total of approx. 5,1345 km of water supply network, Available (achievable) - Achievement of the target will be ensured by: - securing funds by the Applicant, - carrying out preliminary activities such as making investor cost estimates, obtaining the necessary permits, etc. - the proper conduct of tender procedures, - the Applicant's experience in the implementation of infrastructure projects, Realistic - The project's objective is achievable within the assumed scope and scale. The applicant will provide adequate financial and organisational resources to ensure that the planned investment is implemented as planned. Timed - The goal of the project is strictly timed. The project is a response to the identified needs of the municipality and its inhabitants, which are: - reduced standard of living, - failure to provide the necessary infrastructure to increase the number of entities conducting economic activity and the resulting restrictions on the creation of new jobs, - little interest in the region of foreign capital. Orderly water and wastewater management, rational waste management and prevention of environmental degradation are very important aspects in the economic development of municipalities, increasing their competitiveness and attractiveness. 1. Extension and reconstruction of the water supply network in Kobyle The scope includes reconstruction of a section of the water supply network with a length of 23.2 m, construction of a reservoir water pumping station V = 10.0 m3 with power supply, monitoring system and construction of a fence of the pumping station area. 2. The extension of the treated water reservoirs of the Frysztak Water Treatment Station includes the construction of two clean water reservoirs with a capacity of 50 m3 each, along with the replacement of filter beds and the modernisation of water treatment technology. 3. Extension and reconstruction of the water supply network in the towns of Fortress , Glinik Dolny , Frysztak with a total length of 3985,6 m together with the construction of hydrants in the amount of 13 pcs. 4. Construction and reconstruction of the 487.5 m long water supply network in Fortress and Frysztak 5. Construction of a section of the water supply network in Pułanki and Frysztak with a total length of 374.4 m. 6. Construction of a water supply network in m Frysztak with a total length of 262.5 m from the existing water supply system W1, 7. Reconstruction of the section of the Frysztak SUW water supply network with a length of 48.0 m 8. Delivery and installation of a photovoltaic installation with a capacity of 49.95 kW at the Frysztak SUW

Flag of Poland  Rzeszowski, Poland