The material scope of the project includes the extension and modernization of the existing water treatment plant in Ślęzaki. By doing so, the volume of water produced will be increased, water quality will be improved and the operating costs of the facility will be reduced and water losses will be reduced. The scope of the planned investment will include: 1. Execution of the treated water tank V=200m3 2. Modernisation of the existing treated water reservoir 3. Reaction tank construction 4. Expansion of filter hall 5. Water treatment technology 6. Electrical installations and AKPiA 7. Modernization of wells and piping 8. Installation of photovoltaic installation 50kWp 9. Internal road and fence 10. Pipelines between object 11. Reconstruction of sections of the water supply network by incorporation into the existing network of water metering wells in Baranów Sandomierski, Dymitrów Duże, Wola Baranowska, Knapy, Durdy, Ślęzaki, Dąbrowica, Marki and Kaczaki 12. Orders to develop project documentation 13. Investor supervision orders 14. The main problems of project beneficiaries are: - Threats to the security of water supply with the parameters of water suitable for human consumption for all residents of the Municipality, - Insufficient condition of water distribution infrastructure, including the lack of armament of areas intended for industrial, recreational and residential activities, - Significant degree of consumption of technology functioning in the SUW, - Emergency of water abstraction systems increasing service costs - High economic indicators of water infrastructure, which generate high service costs due to the above problems. The main objective of the project is to improve water management in the Baranów Sandomierskiego Commune. The main objective will be pursued through specific objectives, which will be related to the long-term benefits that will be achieved through the implementation of the project: • increasing the availability of drinking water in the area covered by the investment, which will contribute to raising the standard of living of the inhabitants of the commune, as well as indirectly towns in which the project will be implemented • protection of groundwater • improvement of fire protection of the area covered by the investment • increasing the economic, tourist and settlement attractiveness of the commune areas • improving the quality of services related to water management • reducing the number of accidents • improving the working conditions and safety of SUW employees • reducing the unit costs of water management • improving the image of the commune / town • increasing the ecological awareness of residents. The project to improve the functioning of water infrastructure in the area covered by the project is an element of filling the gaps in the water management of the Baranów Sandomierski Commune and is also an element of strategic thinking about the development of the entire Commune. Water management is one of the main factors determining the state of the natural environment and the quality of life of residents. This project also aims to expand and organize water supply management and eliminate existing failures. The layout of the planned construction works allows for the adoption of an optimal schedule for the performance of individual tasks and the adopted technological solutions, modern equipment, ensure proper quality and relatively low investment costs. For this purpose, a well-functioning water supply system is necessary, depending on the investment needs. In addition, increasing the level of water infrastructure equipment by the elements indicated in the material scope will reduce the distance of the municipality to the more developed areas of the voivodship. The project submitted for funding is a means to solve the identified problems. The objectives and scope of the investment are closely related to the existing problems in the area of water and sewage management of the municipality.