project info
Start date: 12 September 2023
End date: 31 December 2025
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 758 488,97 €
EU contribution: 634 297,35 € (85%)
programme
Programming period: 2021-2027
beneficiary
European Commission Topic
European Commission Topic

Improving accessibility of public buildings in the Municipality of Lubenia

The project pursues objective ERDF/CF.CP4.V , specific objective 4(iii) ,)scope of intervention 127-Other social infrastructure contributing to social inclusion. The project includes: 1. Preparation of the project - documentation 2. Implementation of the project – works and investor supervision 1) improvement of the accessibility of SP Straszydle (exterior works and construction of a ramp for dew) - 1 building 2) improvement of the accessibility of SP Siedliska (exterior works and construction of a ramp for dew) - 1 building 3) improvement of the accessibility of SP Lubenia (exterior works and construction of a ramp for dew) - 3 buildings (described later in the application) 4) improvement of the accessibility of GOPS Lubenia (exterior works and construction of a ramp for dew) - 1 building 3. The object of the project is to adapt the accessibility of public facilities infrastructure (under CP4) to the needs of NSAs in a wide range. 5 school facilities and 1 GOPS facility\). Support will concern only identified e.g. infrastructure deficiencies or damage, relevant in the context of accessibility for NSAs. The supported premises are located in areas close to the local community and poorly connected. The submission of the application was preceded by a needs analysis taking into account the options in accordance with the NCP). The scope of works in buildings includes: Replacement of the floor. Replacement of exterior and exterior doors and widening of door openings with a minimum passage light of 90 cm Installation of guards on corners and poles for the visually impaired Installation of radiator housing Changing the location of the washbasin in the toilet for the disabled with the adaptation of toilets for the disabled - the arrangement of devices installed in it causes difficulties in its use by people moving in wheelchairs, therefore it is necessary to move the washbasin to another place, and adaptation of the toilet for people with disabilities. Painting walls with markings - - Increasing the number of lighting lamps and modernizing lighting - for people with visual impairments. Installation of a wall-mounted staircase platform. Construction of ramps for incomplete. No lawsuit is required on bud. Report the rob. ,EIA The project will meet the accessibility standard: digital, information-promotional, architectural . Educational institutions and GOPS do not have driveways for people with disabilities have architectural barriers that we want to eliminate. The aim of the project is to facilitate access to all floors and rooms for people with disabilities and the elderly.

Flag of Poland  Rzeszowski, Poland