As part of the task, 12,025 km of provincial road No 221 on the section from Janków to the Kościerzyna Bypass – Section C – the section from Przywidz to Nowa Karczma and the intersections located on that section of the road will be extended. In addition, the areas of intersections of district and municipal roads with the provincial road, as well as a number of elements of the existing technical infrastructure, will be subject to construction and reconstruction. The aim of the road extension is to adapt it to class G road parameters and improve the safety conditions of all road users. The project provides for the reconstruction of the surface structure along with the strengthening of the ground floor, a thorough reconstruction of the surface structure of the provincial road No. 221, a slight correction of the geometry of the horizontal and vertical arcs of the route, the reconstruction of intersections with public roads, the separation of pedestrian and bicycle traffic from the roadway (construction of pavements and pedestrian-bike paths) and the construction of bus stops. A walking and cycling path has been designed on one side of the provincial road along the entire length of the built-up area of Przywidz and almost the entire length of Trzepowo. Its width will be 3 m and not less than 2.5 m on sections extending beyond the built-up area. On the opposite side of the provincial road, a pavement was designed. The walking and cycling path was also designed on the section from Horniki Dolne.