Construction of NGA network in Lubelskie Voivodship in the area of 5.06.05.00 The main goal of the project is to create the possibility of providing and providing ultra-fast broadband Internet access services with a minimum guaranteed bandwidth of 300Mbps with the possibility of increasing to 1 Gbps in the Lublin district for 2172 address points (basic), which include 2205 dwellings and 292 enterprises in the intervention area with the identifier: 5.06.05.00. The network will cover all address points (basic) indicated in the competition documentation, which will eliminate territorial differences in the ability to access ultra-fast high-speed broadband Internet, all with a minimum connection of 300Mbps. It will also be covered by 100% points indicated as own investments worth PLN 5 796 231.36.share on FacebookTwitterLinkedinEmailreport an issue