The aim of the project is to broaden the availability of the Internet in the Pleszno district through the construction of a broadband network in areas where access to the Internet is difficult and where a market failure or significant inequalities in terms of access to the network have been identified. FERC.01.01 Increasing access to ultra-fast broadband. The project will be implemented in both urban and rural areas and concerns localities in the following 6 municipalities: Chocz, Czermin, Dobrzyca, Gizałki, Gołuchów, Pleszew. It includes the construction of a single-mode fiber optic main, access and subscriber network for subscribers indicated in the project. In the plans for the implementation of the project for the investment area 5.30.20.00, several basic parts can be distinguished: 1) Adaptation and use for the purpose of the project of the existing OLT gpon access node in the locality: -Pleszew, and purchase and installation of three new OLT gpon access nodes in the following locations: -Dobrzyca, -Gołuchów, -Gizałki. 2)Preparation of the PWR point (Pleszew, ul. Reja 8), which will cover the entire competition area of Pleszew County -5.30.20.00. 3)Construction of physical, passive single-mode fiber optic network. The total length of the new fiber optic network with connections will be: 631,843 km and this value will be reached at the end of the project. The project will cover broadband networks: Additional dwellings with broadband access to very high bandwidth networks -3486pcs Additional enterprises with broadband access to very high bandwidth networks -466 pcs Additional address points with broadband access to very high bandwidth networks -3243pcs Number of access nodes -4 pcs.