project info
Start date: 2 January 2025
End date: 31 December 2026
funding
Fund: Just Transition Fund (JTF)
Total budget: 920 358,36 €
EU contribution: 690 268,77 € (75%)
programme
Programming period: 2021-2027
intervention field
European Commission Topic
European Commission Topic

Construction of RES installations in public facilities in Świętochłowice.

The proposal concerns the supply, installation, commissioning and implementation of a procedure for the integration of photovoltaic installations in 13 public buildings into the DSO network. The objects covered by the project are: 1. Municipal kindergarten No. 2 installation of PV installations with a capacity of 13 kW 2. Municipal kindergarten No. 4 installation of PV installations with a capacity of 13 kW 3. Municipal kindergarten No. 8 installation of PV installations with a capacity of 13 kW 4. Municipal Kindergarten No. 11 installation of PV installations with a capacity of 30 kW 5. Municipal Kindergarten No. 13 installation of PV installations with a capacity of 13 kW 6. Primary School No. 1 installation of PV installations with a capacity of 35 kW 7. Primary School No. 2 installation of PV installations with a capacity of 15 kW 8. Primary School No. 3 (ZSP) installation of PV installations with a capacity of 40 kW 9. Primary School No. 4 installation of PV installations with a capacity of 30 kW 10. Primary School No. 8 installation of PV installations with a capacity of 50 kW 11. Primary School No. 17 installation of PV installations with a capacity of 22 kW 12. Complex of General Education Schools installation of PV installations with a capacity of 40 kW 13. In addition, as part of the project, the installation of hybrid LED lamps with one lighting fixture with a power of min. 42 W combining a minimum of 2 PV panels and a wind turbine is planned. Ultimately, the lamps will be installed in the following locations: - Kalina Pond Area - 36 hybrid lamps, - Land at ul. Ślęzan – 25 hybrid lamps. The need to implement the project results from the need to improve the quality of the environment in the municipality (reduction of emissions from the public sector). Designed PV installations installed within the above-mentioned facilities will work in the on-grid system. The energy generated by the installations will be used for the own needs of the buildings. The municipality will implement information and promotion activities in accordance with the requirements of the general regulation, guidelines on information and promotion of cohesion policy operational programmes for 2021-2027 and in accordance with the Visual Identity Book of the European Funds 2021-2027 brand. As part of the information and promotion measures, it is planned to purchase and assemble mandatory boards (one within each building covered by the project) and to include a description of the project on the website. https://Świętochłowice.pl/

Flag of Poland  Katowicki, Poland